Elastomeric Wall Coating
High-build coating for cracked stucco and block that bridges hairline cracks and keeps wind-driven rain out of the wall.
See elastomeric wall coatingBuilders need painters who show up when the drywall is ready, finish on schedule, and return for punch lists without slowing the closing date.
Typical new construction interior paint in Dallas runs $2.35 to $3.90 per square foot of floor area for a standard spec home, with exterior paint priced by siding type and trim detail. Most homes take four to eight working days of paint across stages. Punch list visits are part of the scope. A plan review sets the real number.
New construction painting is about fitting into a build schedule. We plan around drywall finishing, trim carpentry, cabinets, flooring and final cleaning so paint goes on at the right stage and is not damaged by trades that come after it. If the drywall finisher is late, we adjust instead of rushing primer onto wet mud.
Builders in Frisco, Prosper, Celina, Forney and the growing areas around DFW often run several homes at once. We assign a crew lead to each builder who tracks which houses are at which stage and keeps the superintendent updated. That lead also handles color selection sheets for each house, so a home in one phase does not get the wrong palette.
Custom home builders in Preston Hollow, the Park Cities and Lakewood need more finish options. We handle those builds with custom colors by room, specialty finishes and staining of interior woodwork where the plans call for it. Multifamily and townhome builders get the same staged approach on a larger scale.

Most new homes are painted in stages. Walls and ceilings are primed once drywall finishing is done, before trim and cabinets go in. Trim and doors are then painted or sprayed after carpentry, and final wall coats go on after cabinets and countertops are installed. Spraying trim before flooring goes in keeps overspray off finished floors.
Fresh drywall needs a proper primer so mud and paper absorb paint evenly. Skipping it causes flashing, where taped seams show as dull lines in daylight. Ceilings usually get a flat white, walls an eggshell or matte, and trim a semi-gloss or satin enamel. Bathrooms and laundry rooms get a moisture-resistant finish so the paint holds up to steam.
The walk-through sets your real number, written line by line.
Most new homes in DFW suburbs use fiber cement siding like Hardie board, stucco or a mix of brick and siding. Factory-primed fiber cement still needs two finish coats of acrylic paint. Cut ends need to be primed and caulked or water soaks in and the siding swells. Window frames and door trim are masked before spraying siding.
New stucco has to cure before it can be painted, and fresh masonry is alkaline, so we use an alkali-resistant primer on fresh stucco. When the builder calls for it, an Elastomeric Wall Coating gives the walls extra protection against cracking as the foundation settles into clay soil. Brick and stone are kept clean of paint with careful masking.
Weather matters on new builds too. Summer exterior painting starts early and avoids surfaces in direct afternoon sun, and we watch the forecast in spring so fresh paint is not caught in a storm. Exterior trim, soffits and fascia are done with Fascia, Soffit & Trim Painting detail so lines stay clean. Garage doors and front doors are painted on their own schedule once they are hung.

After flooring, plumbing fixtures and appliances go in, there is always a list of dings and scrapes. We return for punch list work before the buyer walk-through and again after it if the buyer flags items. Each visit is quick, and the touch-ups blend because we use the same paint batch. Punch work is scheduled around the cleaning crew and the final walk.
We leave labeled touch-up paint for each home, listing the color, brand and sheen by room. That helps builders with service calls after closing and gives the homeowner what they need for small repairs. Builders also receive a color list for each home to keep with the file.
As homes settle in their first year, drywall nail pops and corner cracks appear, especially in DFW clay soils. Builders who handle those calls can schedule Drywall Repair & Patching visits with us so the patch and paint match the original finish. Repeat business is what builders count on, so we treat each punch visit as part of the job and not an extra.
Drywall finished and the paint crew is late
Painters falling behind on multiple builder homes
Flashing seams showing after final paint
Punch lists delaying closing dates
Custom finishes that standard crews will not handle
Exterior siding cut ends left unprimed
We review plans, finish schedules and color selections with the builder or GC.
Walls and ceilings are primed once drywall finishing is complete.
Trim, doors and casing are sprayed or brushed after carpentry is done.
Walls and exterior surfaces get finish coats after cabinets, counters and siding.
We return for punch lists before and after the buyer walk-through.
Both. We work with production builders running many homes at once and with small builders doing one or two custom homes a year. Smaller builders often need more help with color selections and finish choices, and we can provide that. Larger builders usually need a predictable schedule and a crew lead who tracks each house, which we assign.
That is called flashing. Joint compound and drywall paper absorb paint differently, so without a proper primer the seams look dull or shiny in daylight. We prime all new drywall with a primer made for it before finish coats. Strong light from Dallas windows makes flashing easy to see, so the primer step is not skipped.
Yes. Many builders hire us for both. Interior work follows drywall, trim and cabinet stages, and exterior paint follows siding, stucco and trim installation. Doing both keeps colors coordinated and simplifies scheduling for the superintendent. We still schedule each around weather and the other trades on site.
We leave labeled touch-up paint for each room and exterior color. If the builder handles first-year service calls for nail pops, settling cracks or scuffs, we can schedule return visits on the builder's request. Repairs use the same paint products as the original job, which helps patches blend into the surrounding wall.
High-build coating for cracked stucco and block that bridges hairline cracks and keeps wind-driven rain out of the wall.
See elastomeric wall coatingFascia, soffit, window and door trim repaints, including rot fixes and gutters, often done without repainting the whole house.
See fascia, soffit & trim paintingCrack, hole, and water-damage repairs taped, textured to match, primed, and painted so the patch does not show.
See drywall repair & patchingCall and a person answers, day or night. We will set a walk-through and write up every surface before any work starts.